Kitchen First Fix And Downstairs Toilet First Fix

Project Info

  • Construction Date

    June 2018

  • Category

    First Fix

What we did


For this job we had to install fresh pipework in the kitchen and send the pipes upstairs to connect to the upstairs bathroom as well as sending the pipework through the wall to feed the downstairs cloakroom which was going to have a toilet and basin. We also installed an outside tap and drilled the waste through the wall for the sink and connected it outside in the soil pipe.


All the pipe work in the cloak room was inset in a channel in the wall to conceal the pipework when completed.