Shop Basin

Project Info

  • Construction Date

    June 2017

  • Category

    Basins

What we did


For this job we had to find a good position for the new basin which wasn’t easy as it had to go on the opposite site of the room to allow for a later partition. We decided to run the pipework round the room along with the waste. this was a long way to send the pipework and waste pipe but there was not any other viable options. We then drilled through the wall into an adjacent bathroom where we connected both the hot and cold pipe work along with the waste.

Quality and style


This new basin is of good quality. We fitted it with a very nice mixer tap and a push up waste and trap assembly.