kitchen first fix

Kitchen First Fix And Downstairs Toilet First Fix

What we did


For this job we had to install fresh pipework in the kitchen and send the pipes upstairs to connect to the upstairs bathroom as well as sending the pipework through the wall to feed the downstairs cloakroom which was going to have a toilet and basin. We also installed an outside tap and drilled the waste through the wall for the sink and connected it outside in the soil pipe.


All the pipe work in the cloak room was inset in a channel in the wall to conceal the pipework when completed.

kitchen new pipework

Kitchen First Fix

What we did


For this job we first stripped out all the old pipe work which was in bad condition and was not even clipped to the wall. We then put in the pipes for the sink, dishwasher, washing machine, outside tap and re piped up the cold and hot for upstairs. We also had to re pipe up the water meter